This project showcases the fabrication and installation of a machine ducting system at PT. Indospring Tbk Plant 3B. The ducting system was developed to support proper airflow circulation and improve machine operational efficiency inside the industrial facility. The project highlights the fabrication process, structural installation, and the final implementation of the ducting system.
Develop and install a machine ducting system to ensure proper airflow circulation and enhance machine operational efficiency within the facility.
Complete ducting fabrication, structural installation, system integration, and airflow optimization for machine operations.
Successfully implemented machine ducting system improving airflow circulation and operational efficiency of industrial machinery.
Documentation of fabrication work, installation process, and final system implementation.
Design Phase
Fabrication
Installation
Completion